Fresno, CA – 132 kW |
||||
This manufacturing facility is a new construction and the solar was integrated to the original design from the get-go. As businesses understand solar savings and its unique low-risk, high-return nature, it becomes more and more an integral part of a building structure, whether it is a retrofit or a new construction. This company will save on its electrical bills from Day-1 and is expected to spend only a few hundred dollars a month for power, whereas a similar building with no solar would have to spend over $35K for power in its first year and more as the price of electricity increases year by year. System DetailsNumber of panels: 540 Lifetime Environmental Benefits
|
[…] Vaha Energy optimized the savings by not only installing solar panels but also switching the company’s rate schedule with San Diego Gas and Electric from their usual rate to renewable energy rate, which significantly lowered the demand charges. The company further decided to install solar on their Fresno facility. […]